aukra-cranes-on-962-VARD-9-01-NCT-Offshore

We are proud that VARD and NCT Offshore have chosen to equip their new Cable Laying Vessel with AUKRA Cranes and Hatches.

This VARD 9 01 has been specially designed and equipped for subsea cable laying operations in close collaboration with NCT Offshore, and with a high focus on good sea-keeping capabilities, excellent station keeping performances and low fuel consumption. For improved sustainability the vessel will be equipped with a complete SeaQ power and control package, encompassing batteries, switchboards, and shore connection, allowing for reduction in fuel consumption and increased operability. All this will be operated from the SeaQ bridge with focus on ease of operation, safety, and ergonomics. Further, the vessel is fitted with two main cable tanks, T-ROV hangar, walk-to-work system, is prepared for a large A-frame and single-cabin accommodation for 60 persons. The vessel is equipped with a DP2 system as the primary activities are inter-array cable installation, with capability of cable repair/maintenance and fiber optic cable installation built into the design and fitting of the vessel.