Innovative løfte- og håndteringsløsninger for Antarctic Provider

Automated loading and unloading cargo handling system installed in the supply vessel
 Antarctic Provider

Tailor made cargo handling system for automated loading and unloading of Aker Biomarine’s new supply vessel.

The supply includes a specially designed and built cargo handling system. Aukra Maritime is the major supplier of the Norwegian suppliers of equipment for installation in the supply vessel Antarctic Provider. The highly advanced crane system will cut required time in half to load and unload the processed and packed krill. 

“The fact that Aker Biomarine uses Norwegian suppliers for their projects shows they want high quality equipment and their continued support of the Norwegian marine equipment suppliers. This strengthens our belief that our commitment to product quality and development are justified” says Per Arne Rindarøy, Managing Director of Aukra Maritime.

For deck installation Aukra has supplied cranes, 3 units of model ADK 100; SWL 6 tonnes @ 16 metres, and 1 unit of model ADK 150; 9 tonnes @ 16 metres.
For deck installation Aukra has supplied cranes, 3 units of model ADK 100; SWL 6 tonnes @ 16 metres, and 1 unit of model ADK 150; 9 tonnes @ 16 metres.
Operator’s cabin, 4 units, one each for operation of the 4 cranes installed in the roof of the cargo hold for big bag handling.
Operator’s cabin, 4 units, one each for operation of the 4 cranes installed in the roof of the cargo hold for big bag handling.
Side port, 8 units, for loading and unloading of cargo.
Side port, 8 units, for loading and unloading of cargo.
Crane, 4 units, installed in the roof of the cargo hold for lifting of big bags; each crane takes 12 bags @ 500 kilos in one lift.
Crane, 4 units, installed in the roof of the cargo hold for lifting of big bags; each crane takes 12 bags @ 500 kilos in one lift.
4 units operator’s chair for control of each of the bag handling cranes.
4 units operator’s chair for control of each of the bag handling cranes.