Aukra Maritime is proud to have been selected as a supplier for this project. We will deliver a specially designed bunkering arm that will transport the hydrogen hoses from the quay to the ferry, as well as the docking unit that will be connected to the ferry during bunkering. This will be assembled and tested by us before delivery in the summer of 2026.